Basic Info.
Color
White, Blue, Red or as Customer
Window
Aluminum Alloy or PVC Sliding Window
Roof and Wall Panel
Rock Wool /PU/ EPS Sandwich Panel
Installation
Videos or Other Professional Guide
Environment-Friendly
Recycling Material
Door
Sliding or Rool up Door
Standard
GB, ASTM, DIN, JIS, AISI, BS
Steel Type
Low-alloy High-tensile Structural Steel
Type of Steel For Building Structure
Residential Wall Structure
Wall Support
Application
Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing, Frame Part
Transport Package
Standard Export Package
Product Description
Steel Structure Workshop, Prefabricated Steel Structure Building:
1. Light weight, high strength, 50years durable use, no construction waste.
2. Quality certification ISO: 9001: 2008
3. Cost considering: Time saved, cost saved;
4. Easy move, materials can be recycled used, environmentally;
5. Used widely, used as factory, warehouse, office building, aircraft hangar etc;
6. Structural durabilities, easy maintenance.
Main Structure |
No | Category | Description |
1 | Main structure | Steel (Q345B) |
2 | Second steel structure | Steel (Q235,painted or galvanized) |
Maintenance |
No | Category | Description |
3 | Roof | 0.5mm/150 Fiber Glass / 0.5mm sandwich panel |
840 type steel tile, thickness 0.5mm |
4 | Wall | 0.5mm/150 Fiber Glass / 0.5mm sandwich panel |
840 type steel tile, thickness 0.5mm |
5 | Windows | Plastic steel window / Aluminium alloy window |
6 | Doors | EPS composite board sliding door / Roller door |
Fittings |
No | Category | Description |
7 | Edge cover | Steel sheet , thickness 0.5mm |
8 | Bolt | M24 embedded bolt |
Intensive bolt |
Galvanized ordinary bolt |
9 | Daylighting band | 1.2mm glass reinforced plastic |
This building can used forPrefabricated House,steel structure building,steel structure workshop, steel structure warehouse,steel structure storage,steel structure station ,light steel structure etc.
1. SIZE(m):
LENGTH*WIDTH* EAVE HEIGHT
2. TYPE:
SINGLE SPAN, DOUBLE SPAN, MULTI-SPAN. ONE FLOOR, TWO FLOORS, THREE FLOORS.
3. BUILDING FOUNDATION:
STEEL FOUNDATION WITH ANCHOR BOLTS.
4. COLUMN & BEAM:
MATERIAL: Q235 & Q345 .
5. BRACING:
X or V TYPE BRACING MADE BY ANGEL STEEL, ROUND Bar etc.
6. Wall & Roof C or Z PURLINE:
SIZE: C120~C320mm;
Z100~Z300mm.
7. WALL & ROOF PANEL:
SINGLE CORRUGATED STEEL SHEET;
SANDWICH PANEL INSULATION WITH EPS, PU, ROCK WOOL etc.
8. WINDOW & DOOR:
PVC or ALUMINIUM ALLOY WINDOW;
ELECTRIC ROOL-UP DOOR;
SLIDING DOOR BY SANDWICH PANEL OR SINGLE CORRUGATED STEEL SHEET.
9. Surface Treatment:
HOT GALVANIZED COATING
COLD GALVANIZING
Spray-Painting, Any color, according to your request.
10. ACCESSIORES:
SEMI-TRANSPARENT SKYLIGHT BELTS;
VENTILATORS; DOWN PIPE; GUTTER;
STANDARD BOLTS.
FAQ:
1.Q: Could you please design a new and unique drawings according customer 's needs?
A: Absolutely! We are able to provide you with not only construction scheme and structural drawings, but also landscape design! Besides, detailed drawings and 3D models are surely included. One-stop service is our outstanding superiority with no doubt.
2.Q: What should I provide to build a light steel prefab house?
A: So easy! Sketch drawing would be a better reference for us. However, you will never mind if you don't have any. Simply notify us your requirements, such as the area, usage and the storeys of the house. Before long, you'll possess an amazing design.
3.Q: How could I ensure the cost of building a light steel prefab house?
A: Firstly, the designing scheme should be accepted. Then, the kinds of building materials should be confirmed since different types and qualities make various prices. After that, we will send you a detailed quotation.
4.Q: How Long does it take to build a light steel prefab house?
A: It depends on the size of the house. Generally, the construction period of is 1 month of a 200-square-meter house by a construction team of 5-6 people. It only costs one week to build the steel structure frame.
5.Q: Is it difficult to build a prefab house?
A: Totally not, you can build the house independently according to the construction drawings as long as you know how to use an electric tool .What's more ,we can also dispatch workers and engineers according your needs.
6.Q: what are the advantages of light steel prefab house comparing to the traditional building?
A: Better isolation of sound and heat ,Better fireproof and anti-seismic ,Wind resistance ,Time and labour saving , More usable area ,Excellent termite-proof capability.
Address:
D2-110, No. 1022 Beilao Road, Licang, Qingdao, Shandong, China
Business Type:
Manufacturer/Factory, Trading Company
Business Range:
Construction & Decoration
Management System Certification:
ISO 9001, ISO 14001, ISO 14000
Company Introduction:
36 Years Company History
Our factory started from 1979. Qingdao Jiaonan Government established a shipbuilding company in the year of 1979 with the name Qingdao Lingshan Ship Building Co., Ltd. Our factory was the branch workshop specializing in steel structure construction;
In the year of 2000, Korea Hyundai Shipbuilding Co., Ltd merger and acquisitioned Lingshan Shipbuilding Co., Ltd. And we became an independent private company from the parent company with the name Lingshan Steel Structure Co., Ltd. The main products stayed the same;
2003, we join in the China Steel Construction Society;
2005, we became a director of Shandong Steel Construction Inspection and Design Society;
2006, the factory expanded the produce ability to 1200 ton per month;
2009, we get the China classification society certification;
2011, our company start international business;
2012, we get the produce license for pressure vessel;
2015, our company buy a new piece of land, the land size is 25, 000 sqm. The land will be used to enlarge our produce ability in the future.