Gold Member Since 2013
Audited Supplier
Qingdao Lingshan Steel Construction Co., Ltd.

Prefabricated House, Modular House, Steel Frame manufacturer / supplier in China, offering 3 Level Prefab Labor Camp, Low Cost Prefabricated Steel Buildings Material Design Warehouse, Mobile Steel Structure Storage Shed (LS-S-008) and so on.

(/ )

3 Level Prefab Labor Camp

FOB Price: US $50 / Square Meter
Min. Order: 100 Square Meters
Min. Order FOB Price
100 Square Meters US $50/ Square Meter
Get Latest Price
Port: Qingdao, China
Production Capacity: 100000 Sqm/Month
Payment Terms: L/C, T/T, D/P, Western Union, Paypal, Money Gram

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Type: Light Section Steel
  • Trademark: Quality Carbon Structural Steel and Alloy Structural Steel, Lingshan
  • Connection Form: Bolt Connection
  • Type of Steel For Building Structure: High-Strength Steel
  • Residential Wall Structure: Bottom Wall Beam
  • Material: Light Steel Structure with Sandwich Panel
  • Wall and Roof: Rock Wool /PU/ EPS Sandwich Panel
  • Installation: Videos or Other Professional Guide
  • Window: Aluminum Alloy/PVC Sliding
  • Door: Steel Security Door or Sandwich Panel Door
  • Specification: GB, ISO, SGS, BV
  • HS Code: 9406000090
  • Standard: GB, ASTM, DIN, JIS, AISI, BS
  • Forming: Hot-Rolled Steel
  • Member: Steel Beam
  • Carbon Structural Steel: Q235
  • Application: Steel Workshop, Steel Fabricated House, Steel Walkway and Floor
  • Quality Control: ISO 9001:2008
  • Room Layout: Design as Requirement
  • Environment-Friendly: Recycling Material
  • Life Time: 30-50 Years
  • Transport Package: Standard Export Package
  • Origin: Qingdao, Shandong
Product Description
Product feature
1. Convenient to assemble and disassemble.
2. Practical, good space utilization and high price performance.
3. Almost dry construction which is environmental friendly.
4. Light and reliable, the steel structure is strong and firm.
5. Long life span capacity which could be reached over 30years.
6.Waterproof, fireproof, heatproof, windproof, soundproof 
3 Level Prefab Labor Camp
Materials List for The House:
No.Parts nameK type house (economical)T type house (luxury) / hipped roof house
1roof beam8#C-section steeldouble 14# 16# 18# steel channel
2floor purlins8#C-section steel12# C shaped steel
3ground beam8#C-section steel55mm steel channel
4pillar/columndouble 8#C shaped steeel8# square tube
5ring bream8#C-section steel8# channel steel
6"A" shape roof8#C-section steelangle section steel,C-section steel
7roof purlins8#C-section steel40*80*1.8 square tube
8roof fixtureL40*30 japanese style houses
9external wall50-200mm EPS/glass wool/rock wool/extruded plate)XPS)/phenolic foam board (SDQX)/PU sandwich panel(single steel plate:0.2-0.5mm thickness)50-200mm EPS/glass wool/rock wool/extruded plate)XPS)/phenolic foam board (SDQX)/PU sandwich panel(single steel plate:0.2-0.5mm thickness)
10internal wall50-200mm EPS/glass wool/rock wool/extruded plate)XPS)/phenolic foam board (SDQX)/PU sandwich panel(single steel plate:0.2-0.5mm thickness)50-200mm EPS/glass wool/rock wool/extruded plate)XPS)/phenolic foam board (SDQX)/PU sandwich panel(single steel plate:0.2-0.5mm thickness)
11roof panel20mm PU foam tile50mm/75mm/100mm sandwich corrugated tile,PPGI plate(0.2-0.5mm thickness) Middle:EPS/glass wool/rock wool/extruded plate(XPS) phenolic foam board(SDQX)
12windowPVC sliding windowPVC sliding window/aluminum alloy sliding window
13doorsteel frame with sandwich panel dooraluminum frame with sandwich panel door
14stairsteel stair  japanese style houses
15aisle board3mm pattern-steel plate
16rain shelter shed0.2-0.5mm color steel plate
17floor bearing15mm PLY-wood board
18lengthless than 150 meter  japanese style houses
19widthless than 15 meter 
20heightsingle layer less than 3.1 meter 
doule layer less than 6 meter 
3 layer less than 9 meter 
21inner height2.85 meter per layer 
22roof slope1:05  japanese style houses
23bearing weightroof:70kg/sqm 
24bearing weightfloor:150kg/sqm  japanese style houses
25wind grad11 grede 
26fireproof gradB1-A1 grade 
27temperature−40 to −60 degree  japanese style houses
28anti-earthquake7 grade 


3 Level Prefab Labor Camp
FAQ:
1.Q: Could you please design a new and unique drawings according customer 's needs?
A: Absolutely! We are able to provide you with not only construction scheme and structural drawings, but also landscape design! Besides, detailed drawings and 3D models are surely included. One-stop service is our outstanding superiority with no doubt.
 2.Q: What should I provide to build a light steel prefab house?
A: So easy! Sketch drawing would be a better reference for us. However, you will never mind if you don't have any. Simply notify us your requirements, such as the area, usage and the storeys of the house. Before long, you'll possess an amazing design.
 3.Q: How could I ensure the cost of building a light steel prefab house?
A: Firstly, the designing scheme should be accepted. Then, the kinds of building materials should be confirmed since different types and qualities make various prices. After that, we will send you a detailed quotation.
 4.Q: How Long does it take to build a light steel prefab house?
A: It depends on the size of the house. Generally, the construction period of is 1 month of a 200-square-meter house by a construction team of 5-6 people. It only costs one week to build the steel structure frame.
 5.Q: Is it difficult to build a prefab house?
A: Totally not, you can build the house independently according to the construction drawings as long as you know how to use an electric tool .What's more ,we can also dispatch workers and engineers according your needs.
6.Q: what are the advantages of light steel prefab house comparing to the traditional building? 
A: Better isolation of sound and heat ,Better fireproof and anti-seismic ,Wind resistance ,Time and labour saving , More usable area ,Excellent termite-proof capability.
3 Level Prefab Labor Camp
 
(1). Wind resistance: Grade 11(wind speed≤ 120km/h)
(2). Earthquake resistance: Grade 7
(3). Live load capacity of roofing: 0.6kn/m2
(4). External and internal wall heat transmission coefficient: 0.35Kcal/m2hc
(5). Second Floor Load Capacity: 150 kg/m2
(6). Live load of corridor is 2.0kn/ m2
(7).Wall permitted loading: 0.6KN/ m2
(8).Ceiling Permitted live loading: 0.5 KN/m2
(9).Wall Coefficient of thermal conductivity: K=0.442W/m2k
(10).Ceiling Coefficient of thermal conductivity: K=0.55W/ m2K  
3 Level Prefab Labor Camp

Service
1. Professional design and engineering team:
    Full solution for site camp design. We could make the design for whole camp as per your requirement.  
 2. Procurement and Manufacture for all material:
    We have a professional procurement team to make sure all the materials are with good quality. And our factory operation under ISO standard, to make sure the fabrication works with high technology.  
 3. Site management & Installation supervision: 
    We could send our engineers to help for the installation supervision, you just need to prepare a team which know normal construction works will be OK.

3 Level Prefab Labor Camp
Contact Information:

Matthew Mu

TEL:18562680560  
Send your message to this supplier
Avatar
Mr. Matthew
*From:
To: Mr. Matthew
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now