Gold Member Since 2013
Audited Supplier
Qingdao Lingshan Steel Construction Co., Ltd.

Steel Structure Warehouse, Steel Warehouse, Pre Engineering Warehouse manufacturer / supplier in China, offering Pre Engineering Cheap Steel Structure Warehouse (LS-SS-154), BV Cerrificated Cost Saving Prefabricated Workshop in France (LSWS), Lingshan Steel Frame Building--ISO9001: 2008 (LSSB) and so on.

(/ )

Supplier Homepage Product steel structure warehouse Pre Engineering Cheap Steel Structure Warehouse (LS-SS-154)

Pre Engineering Cheap Steel Structure Warehouse (LS-SS-154)

FOB Price: US $55 / Square Meter
Min. Order: 1 Square Meter
Min. Order FOB Price
1 Square Meter US $55/ Square Meter
Get Latest Price
Production Capacity: 10000sqm/Month
Transport Package: Standard Export Package
Payment Terms: L/C, T/T

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: LS-SS-154
  • Material: Steel
  • Load Capacity per Layer: 150kg - 500kg
  • Serviceability: Common Use
  • Goods characteristics: Product Warehouse
  • operation: Artificial Addressing Artificial Loading
  • Purlin: C-Section and Z-Section
  • Trademark: Lingshan
  • Origin: Qingdao Jiaonan
  • Type: Single-Layer Warehouse
  • Height: 5m - 15m
  • Usage: Industrial
  • Shelf height: 5m~15m
  • Function: Storage Type Stereoscopic Warehouse
  • Column and Purlin: Welded H-Section and Hot Rolled I-Section
  • Roof and Wall Panel: Rock Wool /PU/ EPS Sandwich Panel
  • Specification: Chinese stdandard
  • HS Code: 9406000090
Product Description


Pre Engineering Cheap Steel Structure Warehouse (LS-SS-154)Pre Engineering Cheap Steel Structure Warehouse (LS-SS-154)


 The advantage of our building
Pre Engineering Cheap Steel Structure Warehouse (LS-SS-154)
 (1) Enough strong
it can  resist 70m/s hurricane and G10 seismic intensity and protect your life and property. Furthermore, we also can design and build a stronger building according to your required.

 (2) No water-seepage problem.
we designed a whole reasonable and effective method of flashing plate and over-lapped of steel sheet, with superior quality closure strips.

 (3) High-performance heat insulation
35mm PU = 50mm EPS = 55 glass wool/fiberglass = 60mm rockwool = 475mm concrete = 1075mm brick

 (4) Excellent Anti-corrosion and long life
good shot blasting and 4 layers paint(90micron)/1 layer hot deep galvanized (80-200g/sqm) will provide our building 25-50 years life.

 (5) Good air permeability and more natural lighting
natural roof turbine ventilators,
bridge ventilators,
roof sky lighting belts,
wall sky lighting belts,
varies of windows, 

they will bring us more  fresh air and natural lighting.

 (6) Quick installation
12 workers can assemble 1000sqm within 20 days.

(7) 100% recovery.

Packaging & Shipping

In usually, make the protected package on every items and ship them by 40' OT or 40'HC
 

Our Services

1. Free Design
 make a free design according to your requirements.

2. Produce every compoents of the building
as follows are our production process and quality check
Pre Engineering Cheap Steel Structure Warehouse (LS-SS-154)
 (1) purchasing of raw material:
performance of all steel plates must be in accordance with Q345 or Q235 required in country standards, no sandwich flaws, no dopants and no crack.

Physical Property
Steel NO.   Yield Point(N/mm2)      Tensile Strength (N/mm2) 
Q235B                      235                                375-500                   
Q345B                      345                                470-630                   


Chemical Constituent (%)
Steel No.                 C                  Mn                 Si                   S             P     
Q235B           0.12-0.20         0.30-0.70        ≤0.3           ≤0.045        ≤0.045   
Q345B               ≤0.20            1.00-1.60        ≤0.55         ≤0.040        ≤0.040   

 (2) Plate cut:
all notch is slippy and straight, it will be a good start for welding.

 (3) Assemblage:

 (4) Automatic welding for H steel
a
utomatic arc-submerging welding: full weld, and check weld joint very carefully in order that there is no crack, no unjoint, no lack of penetration, no slag inclusion and no blowhole.

 (5) Straightening.

 (6) Holes Drilling
accuracy position of hole will be helpful of quick installation and fastness

 (7) Manual welding for stiffener and connecting plate. 

 (8) Shot blasting:
grade: Sa2-2.5
rust will fall off paints, so better blast cleaned, better paints.

 (9) Application of paints:
two layers primer paints and two layers surface paints, total thickness of paints is 90 micron.
in addition, there will be anti-fire paints if required.

 (10) Acid cleaned and hot deep galvanized
in usually, in order to protect the service life of some buildings which are near the sea or established in strong corrosion place, we will use the acid cleaned and hot deep galvanized.
thickness of galvanized: 80-200g/sqm

Company Information

LingShan have been built 9 million verities of steel structure building for our customers from all over the world.

Allows is our long term cooperation companies:

Sinopec
Hyundai
Posco
Maersk
Shangri-La
Haier
CNPC

Our main certificate:

1. BV ( Bureau Veritas Certificate )
2. CCS ( Welder Qualification Certificate From China Classification Society )
3. WQC (  Welder Qualification Certificate )

Our production ablity:
1000-1200 Tons/month, about 70,000 sqm/month.

Professional is our best service. 
Looking forward to your inquiries !

Send your message to this supplier
Avatar
Ms. Julia
sales
*From:
To: Ms. Julia
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

Find Similar Products By Category